1. Confirming a metal stop at an assembly fixture
An assembly fixture can present a metal stop to the flush sensing face at a commissioned gap within the nominal 2 mm range. Complementary NPN outputs give external sequencing logic normally-open and normally-closed conditions for the presented target. Setup checks actual metal, mounting geometry and positioning variation throughout the intended fixture movement and operating conditions.
Problem Solved
A metal-stop reference helps external fixture logic recognize the presented mechanism position, using contactless sensing and complementary electrical conditions at a commissioned target gap.
Metal stop
Flush mounting
Complementary NPN
2. Counting separated metal features on a rotating member
A machine can present separated metal features past the sensing face and feed the NPN switching transitions to external counting logic. The 2,000 Hz switching specification provides a timing reference for commissioning the actual feature width, clear gap and rotational speed. Mechanical installation maintains a qualified target gap and respects the M12 flush-mounting arrangement.
Problem Solved
Repeated target transitions give external counting logic a reference for tracking separated metal features, supporting event counting through a known mechanical arrangement and validated timing.
Metal-feature counting
2,000 Hz
External counter
3. Checking a metal carrier at a transfer position
A transfer station can present a metal carrier tab at a fixed inspection point and sample the complementary NPN outputs after the carrier settles. The flush-mounted housing fits a qualified metal bracket arrangement, while the M12 connector connects supply and both switching signals. External control applies its own dwell timing to distinguish a passing tab from a carrier remaining at the station.
Problem Solved
A carrier-tab presence reference helps external transfer logic recognize sustained occupancy at a fixed position, supporting coordinated release when the monitored carrier has cleared.
Carrier occupancy
M12 connection
External dwell timing