1. Confirming a metal fixture at a seated stop
A fixture can present a metal flag within the commissioned sensing gap when it reaches its seated stop. External sequencing evaluates the normally-closed NPN state, which turns off for the detected target. Setup checks the 8 mm nominal and 6.48 mm assured ranges, target-material reduction factors and non-flush clearances before using the condition in an ordinary machine sequence.
Problem Solved
A seated-metal reference helps external sequencing distinguish the fixture’s arrived position, with the inverse output behavior and actual target gap established during commissioning.
Fixture position
NPN NC
Non-flush mounting
2. Counting separated metal features on a moving wheel
A wheel can present separated metal features to the sensing face and generate inverse NPN transitions for an external counter. The 1,000 Hz rating provides a switching-frequency reference, while actual feature width, spacing and gap are checked at operating speed. Non-flush installation clearances and target-material reduction factors are considered so surrounding metal does not become the intended target.
Problem Solved
Repeated inverse metal-passage signals give external counting logic a wheel-motion reference, with feature separation and sensing margin verified for the actual speed and material.
Metal feature count
1,000 Hz
Inverse switching
3. Checking a metal insert before an assembly step
An assembly station can position the expected insert near the sensing face and sample the normally-closed output after presentation. External inspection logic interprets the detected-target off state and distinguishes it from an empty carrier condition. Commissioning checks carrier metal, insert material and position tolerance against the material reduction factors and non-flush installation geometry over the intended temperature range.
Problem Solved
An insert-presence reference helps external assembly logic identify an omitted metal component before a dependent operation, with inverse switching evaluated against the commissioned carrier arrangement.
Insert presence
Assembly inspection
Material-dependent range