1. Counting separated opaque packages across a conveyor
A conveyor can position the sender and receiver on opposite sides of an opaque-package path and feed beam-interruption transitions to an external counter. The red LED beam provides the monitored line, while the 2,000 Hz rating and resistive-load response define sensor timing capabilities. Commissioning verifies alignment, package coverage, spacing and actual controller input timing within the documented sensing range.
Problem Solved
Distinct beam interruptions give external counting logic package-passage events, helping count separated opaque loads at one conveyor position using opposed sender and receiver optics.
Package counting
Through-beam
2,000 Hz
2. Confirming material transfer across a machine opening
A transfer station can place the opposed optics across the line that an opaque component must cross before the next process step. External sequencing logic reads the selected PNP state as a passage condition. Sensitivity and light/dark selection adapt the switching behavior, while setup verifies actual target coverage and alignment across the installed sender-to-receiver distance.
Problem Solved
A monitored beam line provides external sequencing logic with a material-transfer event, helping confirm that an opaque component crossed the selected machine location.
Transfer confirmation
PNP process input
Light/dark selection
3. Monitoring sustained blockage in an accumulation chute
A parts chute can place the red-light beam across a point that clears during normal flow. External timing logic measures how long the selected PNP blocked-beam condition remains present and compares it with the process interval. The sensor supplies the optical condition, while the external timer distinguishes a brief part passage from material that remains across the monitored path.
Problem Solved
A sustained beam-blockage condition gives external timing logic an accumulation reference, helping distinguish passing material from an opaque obstruction that remains at the selected chute location.
Chute accumulation
External dwell timing
Blocked beam